Sales@engineparts.net.nz 09 909 0408 2/23 David Sidwell Place, Stanmore Bay, Auckland
Allstar Remote Starter Button 1.5 Meter Long Leads
ALL76206
NZ$63.50
ALLSTAR PERFORMANCE
Remote Starter Switch, Push Button, 5 ft Cord, Hardware Included
Kit is very helpful for valve lash maintenance when the ignition panel can't be reached. Leads are 60" long and come complete with gator clamps to connect to starter solenoid.
Engine Parts Ltd
Keep up with daily news and learn about new products over on our Facebook and Instagram pages
Contact
Sales@engineparts.net.nz
09 909 0408
© 2024. All rights reserved.
2/23 David Sidwell Place
Stanmore Bay, Auckland
Open Monday-Friday
8:00am to 4:30pm